Office partitions

The glazed run

A partition is rarely one panel

It is a wall of them: three or four panels, sometimes a door in the middle, sometimes returning a corner. Almost everything that goes wrong on a switchable partition is decided by how that run is drawn rather than by the glass in it.

This page is about building the run. Which spaces want one, and the projects already delivered in them, are on offices and boardrooms.

What the run drawing settles

LineWhat it decides
Where the joints fallA panel reaches 70 × 165 in on PDLC glass and 57 × 165 in on PNLC, so a wall wider than that is divided. Better to put the joint where the design wants a line than where the product forces one
Whether the panels switch togetherOne circuit for the whole run, or a room that closes independently of the corridor beside it. This is a wiring decision and it is cheap now and expensive later
Where the transformer sitsOne isolation transformer usually serves a run. It needs a location, a mains supply by others, and a low-voltage route to each panel
Which edge each tail leaves fromHead, jamb or sill, and how the run is concealed in the framing. On a partition this is easy and it still has to be drawn
The door in the middleA leaf moves, so its power has to cross a joint that moves with it. It is made with the fixed panels beside it so the frosted state matches across the whole wall
AcousticsA property of the glass make-up rather than of the switchable layer, and quoted per build-up. A partition at a Toronto investment office was specified at Rw 35–36 dB

The last two are where partitions differ from any other format. A run that contains a door is two products in one wall — see doors — and a room specified for privacy is often also specified for quiet, which the switchable layer does not provide on its own.

The mode

An office is transparent most of the week

Which is the whole argument for reverse mode here. A meeting room is in use for a few hours a day and glazed for the rest, so the state it should hold with no power is the clear one — and the panel then draws under 0.5 W per square foot only while the meeting is on.

Normal mode is the cheaper product and the right one where a room is private most of the time: a consulting room, an HR office, a director’s room with a glass wall onto the floor.

It is also the screen

In its private state the panel is a 94–95% haze diffusing surface, which is what a rear-projection screen is. The partition that closes the room is the surface it presents onto, with nothing to unroll.

Retrofit, on a floor still in use

Film goes onto partitions that are already glazed, which is how GE Vernova converted offices, a conference room and the boardroom without closing the floor.

Nothing to launder

The alternative in a shared office is blinds, which are the thing being cleaned. The glass is cleaned with the rest of the glazing.

Common questions

As wide as the wall. The constraint is the individual panel — 70 × 165 in on PDLC glass, 57 × 165 in on PNLC — so a wider wall is divided into panels. Where the joints fall is a design decision worth making early.

No, and it is worth deciding deliberately. One circuit is simpler and cheaper; separate circuits let a room close while the corridor glazing beside it stays clear. Changing it after the run is wired is the expensive version.

Yes, and it is usual. The leaf and the fixed panels beside it are made together so the frosted state matches across the wall. What the door adds is a joint that moves, and how power crosses it is agreed on the shop drawing.

Not by itself. Acoustic performance is a property of the whole glass make-up and is quoted per build-up; a switchable partition at a Toronto investment office was specified at Rw 35–36 dB. If the room needs quiet as well as privacy, say so at technical review — it changes the glass, not the switchable layer.

That is what film is for. It is applied to the glass in place, the area stays in use, and nothing is re-glazed. The National Library of Medicine and GE Vernova were both done this way.

Send the opening, not the product code

Sizes, the shapes, whether the glass is already in the building and which state it should hold with no power. That is enough for a price and a lead time. Pompano Beach, Florida; (833) 333-8556.